Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 28, 2021, 05:09 AM
  • H 0637_H 0616_09272021_213752.mp4

Date
09/27/2021
W/O
916515
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00192
PipeID
P20469
Time
10:09 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9383
Sewer Name
H JOINT OUTFALL H - UNIT 8J
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_916515_TV15199_OCT2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
H 0637
Downstream MH
H 0616
Dir. of Survey
Downstream
Length Surveyed
494.5 ft.
Total Length
494.5 ft.
Structural Index
3
Structural Quick
3S21
Structural Rating
299
O&M Index
2
O&M Quick
412S
O&M Rating
202
Overall Index
3
Overall Quick
Overall Rating
501
Pipe schematic from manhole H 0637 to H 0616
MH: H 0637MH: H 0616downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06370 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start8.7 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"8.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"17.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"21.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"95.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"102.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES144.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"176 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"212.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"221.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"256.3 ft. MWL - Water Level, 50 %of cross sectional area270.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"274.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"320.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"324.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"385.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"389.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"414.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"442.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"494.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish494.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE494.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish494.5 ft. AMH - Downstream Manhole, Survey Ends - H 0616494.5 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    102.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • General Observation - COCKROACHES IN MANHOLE

    494.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (32)

DistanceCodeObservation
0AMHH 0637
189.7TFA
274.9TFA
0MWL
212.9TFC
21.1TFC
494.5SAP
385.7TFC
494.5MGOCOCKROACHES IN MANHOLE
0MWM
256.3MWL
270.8TFC
8.7TBA
102.2SSS
156.2TFA
70.2TFC
2DAGS
494.5DAGS
176TBA
494.5AMHH 0616
95.3TF
8.7TFA
324.2TFA
144.9TFA
414.2TFC
2SAP
389.4TFA
494.5MGOCONNECTION AT MH 9 O'CLOCK
17.5TFA
320.2TFA
442.6TFC
221.9TFA

Properties (7)

additional_info
630069092721201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-09-27T22:09:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false