Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 4, 2021, 11:16 AM
  • 04 0098_04 0097_10042021_043841.mp4

Date
10/04/2021
W/O
916658
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00409
PipeID
P11835
Time
4:16 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9400
Sewer Name
04 FAIRFAX AVENUE TRUNK
City
WEST HOLLYWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 04
Page No.
02
Purpose
Routine Assessment
Project
WO_916658_TV04029_OCT2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
04 0097
Downstream MH
04 0098
Dir. of Survey
Upstream
Length Surveyed
308.3 ft.
Total Length
308.3 ft.
Structural Index
3
Structural Quick
423J
Structural Rating
175
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
175
Pipe schematic from manhole 04 0097 to 04 0098
MH: 04 0097MH: 04 0098upstream0 ft. AMH - Upstream Manhole, Survey Ends - 04 009826.2 ft. SAV - Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish26.2 ft. JSM - Joint Separated Medium26.2 ft. MMC - Material Change, Vitrified clay pipe28.6 ft. CL - Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES33.2 ft. SAV - Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Start33.2 ft. MMC - Material Change, Concrete pipe (non-reinfored)39.3 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish45.3 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start45.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish116.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"146.3 ft. CL - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES158.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"163.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"196.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"199.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"214.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"230.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"279.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"295.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"301 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start304.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES308.3 ft. MWM - Water Mark, 5 %of cross sectional area308.3 ft. MWL - Water Level, 5 %of cross sectional area308.3 ft. AMH - Downstream Manhole, Survey Begins - 04 0097308.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (9)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    3.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES

    162 ft. - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    263 ft. - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    275.1 ft. - Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Concrete pipe (non-reinfored)

    275.1 ft. - Material Change, Concrete pipe (non-reinfored)

  • Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES

    279.7 ft. - Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES

  • Joint Separated Medium

    282.1 ft. - Joint Separated Medium

  • Material Change, Vitrified clay pipe

    282.1 ft. - Material Change, Vitrified clay pipe

Observations (27)

DistanceCodeObservation
109TF
263FM
12.9TF
191.9TFA
150TFA
282.1SAV
0MWM
78.2TF
183.9TF
7.3CM
0MWL
275.1SAV
93.9TF
162CL
308.3AMH04 0098
111.8TF
0AMH04 0097
0MGOCONNECTION AT MH 3 O'CLOCK
279.7CL
28.4TF
263CM
144.8TF
3.9CM
269FM
275.1MMC
282.1JSM
282.1MMC

Properties (7)

additional_info
630069100421003
custom_field_three
FRACTURES/CRACKS
custom_field_two
2
customer
1
datetime
2021-10-04T04:16:09-07:00
documentation
PRO PIPE
is_lateral_inspection
false