Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 28, 2021, 10:27 AM
  • H 1229_H 1228_09282021_024608.mp4

Date
09/28/2021
W/O
916627
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01182
PipeID
P17653
Time
3:27 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9388
Sewer Name
H JOINT OUTFALL H - UNIT 8K RELIEF
City
VINCENT
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_916627_TV15222_OCT2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1229
Downstream MH
H 1228
Dir. of Survey
Downstream
Length Surveyed
434.7 ft.
Total Length
434.7 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
430
O&M Index
2
O&M Quick
2P00
O&M Rating
172
Overall Index
2
Overall Quick
Overall Rating
602
Pipe schematic from manhole H 1229 to H 1228
MH: H 1229MH: H 1228downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12292 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start280.6 ft. MGO - General Observation - MAG COATING THROUGHOUT346.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"391.2 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"432.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish432.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish432.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish434.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE434.7 ft. AMH - Downstream Manhole, Survey Ends - H 1228

Observation photos (5)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    280.6 ft. - General Observation - MAG COATING THROUGHOUT

  • General Observation - COCKROACHES IN MANHOLE

    434.7 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (14)

DistanceCodeObservation
346.5TFA
0MWM
432.2SSS
432.2SAP
434.7MGOCOCKROACHES IN MANHOLE
2SSS
0MWL
434.7AMHH 1228
432.2DAGS
2SAP
2DAGS
280.6MGOMAG COATING THROUGHOUT
0AMHH 1229
391.2TBA

Properties (8)

additional_info
630069092721206
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-09-28T03:27:49-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
30904