Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 5, 2021, 06:48 AM
  • 15 0612A_15 0612A1_10042021_230019.mp4

Date
10/04/2021
W/O
916518
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00601
PipeID
P26624
Time
11:48 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9452
Sewer Name
15 DOUBLE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0612A
Downstream MH
15 0612A1
Dir. of Survey
Downstream
Length Surveyed
151.6 ft.
Total Length
151.6 ft.
Structural Index
3
Structural Quick
3E00
Structural Rating
93
O&M Index
2
O&M Quick
2E00
O&M Rating
60
Overall Index
3
Overall Quick
Overall Rating
153
Pipe schematic from manhole 15 0612A to 15 0612A1
MH: 15 0612AMH: 15 0612A1downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 15 0612A0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start44.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"83 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"128.4 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6", 6"134.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"141 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area149.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish149.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish151.6 ft. AMH - Downstream Manhole, Survey Ends - 15 0612A1151.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
83TFA
149.8DAGS
0MWM
141MWLS
0MGOCONNECTION AT MH 3 O'CLOCK
128.4TB
149.8SAP
0AMH15 0612A
2DAGS
2SAP
44.4TF
151.6AMH15 0612A1
0MGOCOCKROACHES IN MANHOLE
0MWL
151.6MGOCONNECTION AT MH 3 O'CLOCK
134.7TF

Properties (7)

additional_info
630069100421202
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-10-04T23:48:10-07:00
documentation
PRO PIPE
is_lateral_inspection
false