Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 8, 2021, 08:45 AM
  • 02 1658_02 1657A_1182021_005649.mp4

Date
11/08/2021
W/O
0921566
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00289
PipeID
P18814
Time
12:45 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2006
Sewer Name
02 MONTEREY PARK EXTENSION TRUNK
City
LOS ANGLES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20211105MDM_MONTERY_PARK_EXTENSION_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
02 1658
Downstream MH
02 1657A
Dir. of Survey
Downstream
Length Surveyed
109.8 ft.
Total Length
109.8 ft.
Structural Index
3
Structural Quick
4222
Structural Rating
12
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 02 1658 to 02 1657A
MH: 02 1658MH: 02 1657Adownstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 12:45AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED69.9 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG97.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped100.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped106.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING FLAKING CONCRETE SEVERE AGG ATTACHED109.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING FLAKING CONCRETE SEVERE AGG ATTACHED109.2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG109.8 ft. AMH - Downstream Manhole, Survey Ends - 1:00AM

Observation photos (4)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    69.9 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING FLAKING CONCRETE SEVERE AGG ATTACHED

    106.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING FLAKING CONCRETE SEVERE AGG ATTACHED

Observations (13)

DistanceCodeObservation
97.4TFCCapped
100.4TFCCapped
0MWM
109.8AMH1:00AM
0MGOConn. @ Mh, 9 O' Clock. Active
69.9SAMSEVERE AGG
106.3SSSPEELING FLAKING CONCRETE SEVERE AGG ATTACHED
109.2SSSPEELING FLAKING CONCRETE SEVERE AGG ATTACHED
109.2SAMSEVERE AGG
2SAMSEVERE AGG
0AMH12:45AM
2SSSPEELING CONCRETE SEVERE AGG ATTACHED
0MWL

Properties (6)

custom_field_three
PEELING FLAKING CONCRETE SEVERE AGG ATTACHED
custom_field_two
1
customer
LACSD
datetime
2021-11-08T00:45:49-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false