Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 26, 2021, 08:24 AM
  • 14 0162B_14 0162A_08262021_013644.mp4

Date
08/26/2021
W/O
911937
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18200
Time
1:24 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9245
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_911937_TV14035_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0162B
Downstream MH
14 0162A
Dir. of Survey
Downstream
Length Surveyed
243.5 ft.
Total Length
243.5 ft.
Structural Index
2
Structural Quick
3I2Q
Structural Rating
324
O&M Index
2
O&M Quick
2I00
O&M Rating
96
Overall Index
2
Overall Quick
Overall Rating
420
Pipe schematic from manhole 14 0162B to 14 0162A
MH: 14 0162BMH: 14 0162Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 0162B0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - 65% MAG COAT2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start20 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start39.7 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"42.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"88.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"91.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"140.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"143.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"191.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"195 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"230 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish240.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"241.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish241.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish241.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish243.5 ft. AMH - Downstream Manhole, Survey Ends - 14 0162A243.5 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
195TFC
143.3TFC
0AMH14 0162B
241.2SAP
0MGOCONN @ MH 9 O'CLOCK/OPEN
0MWL
243.5AMH14 0162A
88.6TFC
0MWM
140.3TFC
230MWLS
191.9TFC
2MGO65% MAG COAT
39.7TFC
42.7TFC
243.5MGOCONN @ MH 9 O'CLOCK/ACTIVE
2SSS
20MWLS
2SAP
241.2DAGS
91.3TFC
2DAGS
240.7TFC
241.2SSS

Properties (7)

additional_info
630069082521201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-08-26T01:24:12-07:00
documentation
PRO PIPE
is_lateral_inspection
false