Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 26, 2021, 08:36 AM
  • 14 0162A_14 0162_08262021_014032.mp4

Date
08/26/2021
W/O
911937
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18199
Time
1:36 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9245
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_911937_TV14035_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0162A
Downstream MH
14 0162
Dir. of Survey
Downstream
Length Surveyed
25.1 ft.
Total Length
25.1 ft.
Structural Index
3
Structural Quick
3424
Structural Rating
20
O&M Index
2
O&M Quick
4124
O&M Rating
12
Overall Index
2
Overall Quick
Overall Rating
32
Pipe schematic from manhole 14 0162A to 14 0162
MH: 14 0162AMH: 14 0162downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 0162A0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start22.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish22.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish22.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish25.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0162

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2SAP
25.1AMH14 0162
22.9DAGS
22.9SAP
2SSS
0AMH14 0162A
2DAGS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MWM
22.9SSS
0MWL

Properties (7)

additional_info
630069082521201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-08-26T01:36:59-07:00
documentation
PRO PIPE
is_lateral_inspection
false