Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 26, 2021, 09:55 AM
  • 14 0159_14 0158_08262021_031201.mp4

Date
08/26/2021
W/O
911937
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18195
Time
2:55 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9245
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_911937_TV14035_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0159
Downstream MH
14 0158
Dir. of Survey
Downstream
Length Surveyed
442.6 ft.
Total Length
442.6 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
440
O&M Index
2
O&M Quick
2Q00
O&M Rating
176
Overall Index
2
Overall Quick
Overall Rating
616
Pipe schematic from manhole 14 0159 to 14 0158
MH: 14 0159MH: 14 0158downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 01590 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 60% MAG COAT17.9 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"21.2 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"69.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"72.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"118.7 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"121.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"170.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"173.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"219.4 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"222.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"271.6 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"274.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"323.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"326.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6" - 25% ROOTS-LATERAL372.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"375.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"421.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"424.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"440.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish440.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish440.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish442.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0158

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (29)

DistanceCodeObservation
222.4TFC
0MWM
372.3TFC
72.6TFC
375.2TFC
118.7TFC
21.2TFA
440.8SSS
121.6TFA
0AMH14 0159
2SAP
170.5TFC
173.4TFC
440.8SAP
2DAGS
421.2TFC
271.6TFC
442.6AMH14 0158
17.9TFC
69.8TFC
326.4TFA25% ROOTS-LATERAL
424.2TFC
2SSS
0MWL
440.8DAGS
274.2TFC
2MGO60% MAG COAT
323.3TFC
219.4TFC

Properties (7)

additional_info
630069082521201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-08-26T02:55:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false