Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 26, 2021, 07:53 AM
  • 14 0164_14 0163A_08262021_005925.mp4

Date
08/26/2021
W/O
911937
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P23489
Time
12:53 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9245
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_911937_TV14035_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0164
Downstream MH
14 0163A
Dir. of Survey
Downstream
Length Surveyed
110.9 ft.
Total Length
110.9 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
105
O&M Index
2
O&M Quick
2C00
O&M Rating
42
Overall Index
2
Overall Quick
Overall Rating
147
Pipe schematic from manhole 14 0164 to 14 0163A
MH: 14 0164MH: 14 0163Adownstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 01640 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 45% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"18.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"67.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"108.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish108.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish108.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish110.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0163A110.9 ft. MGO - General Observation - CONN @ H 9 O'CLOCK/ACTIVE

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
108.6DAGS
110.9AMH14 0163A
110.9MGOCONN @ H 9 O'CLOCK/ACTIVE
2DAGS
2MGO45% MAG COAT
70.1TFC
2SAP
67.2TFC
0MWM
2SSS
15.2TFC
108.6SAP
18.2TFC
0AMH14 0164
0MWL
108.6SSS

Properties (7)

additional_info
630069082521201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-08-26T00:53:27-07:00
documentation
PRO PIPE
is_lateral_inspection
false