Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 27, 2021, 09:07 AM
  • 14 0179_14 0178A_08272021_021655.mp4

Date
08/27/2021
W/O
911937
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18218
Time
2:07 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9247
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_911937_TV14035_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0179
Downstream MH
14 0178A
Dir. of Survey
Downstream
Length Surveyed
190.9 ft.
Total Length
190.9 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
185
O&M Index
2
O&M Quick
2F00
O&M Rating
74
Overall Index
2
Overall Quick
Overall Rating
259
Pipe schematic from manhole 14 0179 to 14 0178A
MH: 14 0179MH: 14 0178Adownstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. AMH - Upstream Manhole, Survey Begins - 14 01792 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start104.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"188.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish188.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish188.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish190.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0178A190.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE190.9 ft. MGO - General Observation - ROACHES @ MH

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    190.9 ft. - General Observation - ROACHES @ MH

Observations (16)

DistanceCodeObservation
0MWL
0MWM
188.9SAP
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
2SSS
190.9AMH14 0178A
188.9DAGS
104.4TFC
0AMH14 0179
190.9MGOCONN @ MH 9 O'CLOCK/ACTIVE
188.9SSS
2MGO65% MAG COAT
2SAP
2DAGS
190.9MGOROACHES @ MH

Properties (7)

additional_info
630069082621202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-08-27T02:07:55-07:00
documentation
PRO PIPE
is_lateral_inspection
false