Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 27, 2021, 09:19 AM
  • 14 0178_14 0177_08272021_022938.mp4

Date
08/27/2021
W/O
911937
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18216
Time
2:19 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9247
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_911937_TV14035_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0178
Downstream MH
14 0177
Dir. of Survey
Downstream
Length Surveyed
297.4 ft.
Total Length
297.4 ft.
Structural Index
2
Structural Quick
3K2L
Structural Rating
311
O&M Index
2
O&M Quick
2K00
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
429
Pipe schematic from manhole 14 0178 to 14 0177
MH: 14 0178MH: 14 0177downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 14 01780 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. MGO - General Observation - 65% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start60.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"62 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start101 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish112.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"162.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"210.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"263.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"295.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish295.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish295.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish297.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0177297.4 ft. MGO - General Observation - ROACHES @ MH

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    297.4 ft. - General Observation - ROACHES @ MH

Observations (20)

DistanceCodeObservation
2MGO65% MAG COAT
295.3DAGS
0MGOROACHES @ MH
263.1TFA
101MWLS
0AMH14 0178
210.9TFC
0MWL
0MWM
62MWLS
2SAP
295.3SSS
162.1TFC
2DAGS
2SSS
297.4AMH14 0177
297.4MGOROACHES @ MH
295.3SAP
112.7TFC
60.7TFC

Properties (7)

additional_info
630069082621202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-08-27T02:19:45-07:00
documentation
PRO PIPE
is_lateral_inspection
false