Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 27, 2021, 09:29 AM
  • 14 0177_14 0176_08272021_024001.mp4

Date
08/27/2021
W/O
911937
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18215
Time
2:29 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9247
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_911937_TV14035_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0177
Downstream MH
14 0176
Dir. of Survey
Downstream
Length Surveyed
283.3 ft.
Total Length
283.3 ft.
Structural Index
2
Structural Quick
3J2M
Structural Rating
312
O&M Index
2
O&M Quick
2J00
O&M Rating
112
Overall Index
2
Overall Quick
Overall Rating
424
Pipe schematic from manhole 14 0177 to 14 0176
MH: 14 0177MH: 14 0176downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 01770 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - 60% MAG COAT2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start15.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"26 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start103 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish138.7 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"190.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN241.5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES280.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish280.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish280.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish283 ft. MGO - General Observation - ROACHES @ MH283.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0176283.3 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    241.5 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
283.3AMH14 0176
0MWL
280.8SSS
280.8SAP
283MGOROACHES @ MH
2MGO60% MAG COAT
103MWLS
283.3MGOCONN @ MH 9 O'CLOCK/ACTIVE
0AMH14 0177
2SSS
280.8DAGS
2SAP
15.9TFC
2DAGS
138.7TBA
0MGOROACHES @ MH
241.5CL
190.4TBOPEN
26MWLS
0MWM

Properties (7)

additional_info
630069082621202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-08-27T02:29:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false