Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 30, 2021, 09:21 AM
  • 14 0173_14 0172_08302021_023403.mp4

Date
08/30/2021
W/O
911937
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18211
Time
2:21 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9248
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_911937_TV14035_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0173
Downstream MH
14 0172
Dir. of Survey
Downstream
Length Surveyed
372.2 ft.
Total Length
372.2 ft.
Structural Index
2
Structural Quick
3N2Q
Structural Rating
402
O&M Index
2
O&M Quick
2N00
O&M Rating
148
Overall Index
2
Overall Quick
Overall Rating
550
Pipe schematic from manhole 14 0173 to 14 0172
MH: 14 0173MH: 14 0172downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 01732 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT107.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"174.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"282 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start360 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish369.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish369.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish369.9 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish372.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0172372.2 ft. MGO - General Observation - ROACHES @ MH

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    372.2 ft. - General Observation - ROACHES @ MH

Observations (17)

DistanceCodeObservation
2SAV
369.9SSS
0MGOROACHES @ MH
0MWM
0MWL
2DAGS
372.2AMH14 0172
372.2MGOROACHES @ MH
2SSS
360MWLS
2MGO65% MAG COAT
0AMH14 0173
107.2TFC
282MWLS
174.6TFC
369.9DAGS
369.9SAV

Properties (7)

additional_info
630069083021001
custom_field_three
SPALLING/AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-08-30T02:21:33-07:00
documentation
PRO PIPE
is_lateral_inspection
false