Wastewater/Activity/PacpInspection/1.0Aug 26, 2021, 05:48 AM
  • 14 0170_14 0169_08252021_230654.mp4

Date
08/25/2021
W/O
911937
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18208
Time
10:48 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9245
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_911937_TV14035_SEP2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0170
Downstream MH
14 0169
Dir. of Survey
Downstream
Length Surveyed
206.3 ft.
Total Length
206.3 ft.
Structural Index
2
Structural Quick
2L00
Structural Rating
134
O&M Index
2
O&M Quick
5141
O&M Rating
215
Overall Index
2
Overall Quick
Overall Rating
349
Pipe schematic from manhole 14 0170 to 14 0169
MH: 14 0170MH: 14 0169downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 01700 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start6.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"13.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"15.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start40 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start56.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"62.1 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN84.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS85 ft. MWM - Water Mark, 80 %of cross sectional area99.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"116.2 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"123.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"129.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN175 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish181.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"187.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"203.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish203.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish203.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish204 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish206.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0169

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    15.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

Observations (26)

DistanceCodeObservation
0AMH14 0170
0MWM
13.8TFA
0MWL
56.4TFC
123.4TFC
203.5DAGS
62.1TFOPEN
2SSS
85MWM
99.3TFC
6.9TFC
116.2TBC
203.5DSZ
203.5DAE
15.3DAE
175MWLS
187.2TFC
40MWLS
2DAGS
84.1DSZDEBRIS
181.1TFC
129.7TFOPEN
206.3AMH14 0169
204SSS
0MGOROACHES @ MH

Properties (7)

additional_info
630069082521201
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-08-25T22:48:33-07:00
documentation
PRO PIPE
is_lateral_inspection
false