Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 26, 2021, 08:13 AM
  • 14 0163_14 0162B_08262021_012358.mp4

Date
08/26/2021
W/O
911937
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18201
Time
1:13 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9245
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_911937_TV14035_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0163
Downstream MH
14 0162B
Dir. of Survey
Downstream
Length Surveyed
179.3 ft.
Total Length
179.3 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
175
O&M Index
2
O&M Quick
2F00
O&M Rating
70
Overall Index
2
Overall Quick
Overall Rating
245
Pipe schematic from manhole 14 0163 to 14 0162B
MH: 14 0163MH: 14 0162Bdownstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 01630 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start18.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"21.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"67 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"119 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"122.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"167.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"170.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish177.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish177.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish179 ft. MGO - General Observation - ROACHES @ MH179.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0162B179.3 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
2SSS
179.3AMH14 0162B
0AMH14 0163
170.6TFC
0MWL
177.5SSS
67TFC
179MGOROACHES @ MH
2DAGS
0MGOROACHES @ MH
2SAP
119TFC
70.2TFC
179.3MGOCONN @ MH 9 O'CLOCK/UNKNOWN
177.5DAGS
122.3TFC
167.5TFC
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
177.5SAP
18.5TFC
21.8TFC
0MWM

Properties (7)

additional_info
630069082521201
custom_field_three
SPALLING/AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2021-08-26T01:13:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false