E 0110_E 0109_10212021_021323.mp4
2 ft. - General Observation - 99% MAG COAT START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
70.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT
111 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
111 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, START - SEVERE VAGG SPORATIC
234.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT
430.3 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG
430.3 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 433.7 | AMH | 3:05AM |
| 111 | SSS | BLISTERING PEELING CONCRETE |
| 116.2 | SAV | SEVERE AGG |
| 0 | MWL | — |
| 0 | AMH | 2:30AM |
| 111 | SAV | SEVERE VAGG SPORATIC |
| 433.3 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 430.3 | SAP | SEVERE AGG |
| 0 | MWM | — |
| 0 | — | — |
| 2 | MGO | 99% MAG COAT START |
| 430.3 | SAP | SEVERE AGG |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 433.3 | MGO | 99% MAG COAT FINISH |
| 70.6 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 234.1 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |