Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 21, 2021, 09:11 AM
  • E 0110_E 0109_10212021_021323.mp4

Date
10/21/2021
W/O
0921554
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00032
PipeID
P11336
Time
2:11 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1982
Sewer Name
E JOINT OUTFALL E - UNIT 5
City
WILLBROOK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Capital Improvement Program Assesment
Project
202121MDM_JOINT_OUTFALL_E_UNIT_5
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
E 0110
Downstream MH
E 0109
Dir. of Survey
Downstream
Length Surveyed
433.7 ft.
Total Length
433.7 ft.
Structural Index
3
Structural Quick
3424
Structural Rating
20
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole E 0110 to E 0109
MH: E 0110MH: E 0109downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Downstream Manhole, Survey Begins - 2:30AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft.2 ft. MGO - General Observation - 99% MAG COAT START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT70.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT111 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE111 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, START - SEVERE VAGG SPORATIC116.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES(FINISH) - SEVERE AGG234.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT430.3 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG430.3 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG433.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE UNDER MAG COAT433.3 ft. MGO - General Observation - 99% MAG COAT FINISH433.7 ft. AMH - Downstream Manhole, Survey Ends - 3:05AM

Observation photos (8)

  • General Observation - 99% MAG COAT START

    2 ft. - General Observation - 99% MAG COAT START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT

    70.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    111 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, START - SEVERE VAGG SPORATIC

    111 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, START - SEVERE VAGG SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT

    234.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG

    430.3 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    430.3 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (16)

DistanceCodeObservation
433.7AMH3:05AM
111SSSBLISTERING PEELING CONCRETE
116.2SAVSEVERE AGG
0MWL
0AMH2:30AM
111SAVSEVERE VAGG SPORATIC
433.3SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
430.3SAPSEVERE AGG
0MWM
0
2MGO99% MAG COAT START
430.3SAPSEVERE AGG
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
433.3MGO99% MAG COAT FINISH
70.6SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
234.1SSSBLISTERING PEELING CONCRETE UNDER MAG COAT

Properties (6)

custom_field_three
SEVERE AGG PROJECTING-99% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2021-10-21T02:11:53-07:00
documentation
MARTIN,OLIVER 111,CASTILLO
is_lateral_inspection