E 0111_E 0110_10212021_010018.mp4
0 ft. - Water Mark, 80 %of cross sectional area
2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - LONG CIRCUM REBAR
9 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR MISSING
12.1 ft. - General Observation - ZOOM APPOX 6'
12.1 ft. - Surface Missing Wall, from 11 to 01 o'clock, within 8 inches of joint: NO - POSSIBLE SOIL VISIBLE AT SIPHON DOWNLEG
12.1 ft. - General Photograph - SOIL VISIBLE
12.1 ft. - General Observation - SOIL VISIBLE APPOX 8" WIDE BY 30" LONG
12.1 ft. - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: NO - SOIL VISIBLE APPOX 12' BY 36"
12.1 ft. - Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: NO - VIOD SOIL VISIBLE
12.1 ft. - General Photograph - VOID SOIL VISIBLE
19.9 ft. - Survey Abandoned - DOWNLEG UPSTREAM SIPHON
| Distance | Code | Observation |
|---|---|---|
| 2 | SAM | SEVERE AGG |
| 12.1 | MGO | ZOOM APPOX 6' |
| 12.1 | SMW | POSSIBLE SOIL VISIBLE AT SIPHON DOWNLEG |
| 12.1 | MGP | SOIL VISIBLE |
| 0 | AMH | 12:45AM |
| 12.1 | MGO | SOIL VISIBLE APPOX 8" WIDE BY 30" LONG |
| 12.1 | SMW | SOIL VISIBLE APPOX 12' BY 36" |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 9 | SRC | LONG CIRCUM REBAR MISSING |
| 19.2 | SRC | LONG CIRCUM REBAR MISSING SOIL VISIBLE |
| 19.2 | SAM | SEVERE AGG |
| 0 | MWM | — |
| 19.9 | MSA | DOWNLEG UPSTREAM SIPHON |
| 2 | SRC | LONG CIRCUM REBAR |
| 12.1 | SMW | VIOD SOIL VISIBLE |
| 19.2 | SSS | BLISTERING PEELING CONCRETE |
| 12.1 | MGP | VOID SOIL VISIBLE |
| 0 | MWL | — |