Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 20, 2021, 10:14 AM
  • 16 0047_16 0046_09202021_032738.mp4

Date
09/20/2021
W/O
911488
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00639
PipeID
P13060
Time
3:14 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9415
Sewer Name
16 ALLEN AVENUE TRUNK, SECTS 1,2,&4
City
SAN GABRIEL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_911488_TV16113_SEP2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
16 in.
Width
16 in.
Upstream MH
16 0047
Downstream MH
16 0046
Dir. of Survey
Downstream
Length Surveyed
334.5 ft.
Total Length
334.5 ft.
Structural Index
3
Structural Quick
4E3H
Structural Rating
389
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
389
Pipe schematic from manhole 16 0047 to 16 0046
MH: 16 0047MH: 16 0046downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 00470 ft. MWM - Water Mark, 5 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.2 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start44 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish180.9 ft. FM - Fracture Multiple, from 11 to 05 o'clock, within 8 inches of joint: YES186.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES198.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish198.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start332 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish334.5 ft. AMH - Downstream Manhole, Survey Ends - 16 0046334.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    6.2 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 11 to 05 o'clock, within 8 inches of joint: YES

    180.9 ft. - Fracture Multiple, from 11 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    186.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    198.5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
186.8FM
332SSS
334.5AMH16 0046
0AMH16 0047
334.5FM
180.9FM
44FL
198.5CM
0MWM
2.6CM
0MWL
6.2FL
198.5FM
2SSS

Properties (7)

additional_info
630074092021002
custom_field_three
MULTIPLE CRACKS,FRACTURE'S
custom_field_two
2
customer
1
datetime
2021-09-20T03:14:46-07:00
documentation
PROPIPE
is_lateral_inspection
false