Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 2, 2021, 07:54 AM
  • 05 0713_05 0752_09022021_010721.mp4

Date
09/02/2021
W/O
911334
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00521
PipeID
P05978
Time
12:54 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9347
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK, EXTENSION #1
City
INGLEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
07
Purpose
Routine Assessment
Project
WO_911334_TV05308_SEP2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 0713
Downstream MH
05 0752
Dir. of Survey
Downstream
Length Surveyed
344.8 ft.
Total Length
344.8 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
189
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
189
Pipe schematic from manhole 05 0713 to 05 0752
MH: 05 0713MH: 05 0752downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 07130 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area1.5 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK1.5 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK30.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start344.8 ft. AMH - Downstream Manhole, Survey Ends - 05 0752344.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    30.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
0AMH05 0713
0MWL
344.8AMH05 0752
1.5MGOCONNECTION AT THE MH 9 OC'LOCK
30.5CM
344.8CM
0MWM
1.5MGOCONNECTION AT THE MH 3 OC'LOCK

Properties (7)

additional_info
630074090121202
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2021-09-02T00:54:29-07:00
documentation
PROPIPE
is_lateral_inspection
false