Wastewater/Activity/PacpInspection/1.0Oct 15, 2021, 11:13 AM
  • 15 0371_15 0370_10152021_042149.mp4

Date
10/15/2021
W/O
0917202
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00598
PipeID
P12297
Time
4:13 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1975
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
18
Purpose
Routine Assessment
Project
20211015MDM_BALDWIN_PARK_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
15 0371
Downstream MH
15 0370
Dir. of Survey
Downstream
Length Surveyed
316.7 ft.
Total Length
316.7 ft.
Structural Index
3
Structural Quick
3321
Structural Rating
11
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 15 0371 to 15 0370
MH: 15 0371MH: 15 0370downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:20AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE27 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG214.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG316.3 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active316.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG316.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING FLAKING CONCRETE316.7 ft. AMH - Downstream Manhole, Survey Ends - 4:40AM

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    27 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    214.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (12)

DistanceCodeObservation
2SAPSEVERE AGG
214.8SAPSEVERE AGG
2SSSBLISTERING FLAKING CONCRETE
0MWM
0AMH4:20AM
316.3MGOConn. @ Mh, 3 O' Clock. Active
27SAVSEVERE AGG
316.3SAPSEVERE AGG
0MWL
0MGOConn. @ Mh, 3 O' Clock. Active
316.3SSSBLISTERING FLAKING CONCRETE
316.7AMH4:40AM

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2021-10-15T04:13:19-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false