Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 15, 2021, 06:54 AM
  • 16 0080_16 0079_09152021_000704.mp4

Date
09/14/2021
W/O
911340
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00639
PipeID
P13094
Time
11:54 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9407
Sewer Name
16 ALLEN AVENUE TRUNK, SECTS 1,2,&4
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_911340_TV16121_SEP2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
16 0080
Downstream MH
16 0079
Dir. of Survey
Downstream
Length Surveyed
258.1 ft.
Total Length
258.1 ft.
Structural Index
3
Structural Quick
4F3A
Structural Rating
282
O&M Index
2
O&M Quick
2I00
O&M Rating
102
Overall Index
3
Overall Quick
Overall Rating
384
Pipe schematic from manhole 16 0080 to 16 0079
MH: 16 0080MH: 16 0079downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 00800 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start60.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN73 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start133 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"165.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN210.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"254.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish256 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish256 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish256 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish258.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN258.1 ft. AMH - Downstream Manhole, Survey Ends - 16 0079

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    60.5 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    73 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    165.5 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (17)

DistanceCodeObservation
60.5TBOPEN
133TFC
258.1MGOCONN @ MH 9 O'CLOCK/UNKNOWN
256SSS
254.7FM
210.8TFC
165.5TBOPEN
0MWL
256CM
258.1AMH16 0079
256DAGS
0AMH16 0080
0MWM
2SSS
2CM
73FM
2DAGS

Properties (7)

additional_info
630074091421201
custom_field_three
MUTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-09-14T23:54:33-07:00
documentation
PROPIPE
is_lateral_inspection
false