Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 10, 2021, 10:12 AM
  • E 0017_E 0016_09102021_031721.mp4

Date
09/10/2021
W/O
911507
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00027
PipeID
P07598
Time
3:12 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9358
Sewer Name
E JOINT OUTFALL E - UNIT 1
City
COMPTON
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_911507_TV30070_SEP2021
Sewer Type
Siphon
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
15 in.
Upstream MH
E 0016
Downstream MH
E 0017
Dir. of Survey
Upstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole E 0016 to E 0017
MH: E 0016MH: E 0017upstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES0 ft. MSA - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.0 ft. MLC - Lining Change, Cured in place2 ft. MWM - Water Mark, 70 %of cross sectional area2 ft. MWL - Water Level, 50 %of cross sectional area2 ft. AMH - Downstream Manhole, Survey Begins - E 0016

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES

  • Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.

    2 ft. - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.

  • Lining Change, Cured in place

    2 ft. - Lining Change, Cured in place

Observations (6)

DistanceCodeObservation
0MWM
2DAGS
2MSAVIEW OF UPLEG OF D/S SIPHON.
0MWL
0AMHE 0016
2MLC

Properties (8)

additional_info
630069090921203
custom_field_three
RFIR/LINED WITH CIPP
custom_field_two
3
customer
1
datetime
2021-09-10T03:12:43-07:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP