Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 10, 2021, 08:52 AM
  • E 0021_E 0126_09102021_020956.mp4

Date
09/10/2021
W/O
911507
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00027
PipeID
P23241
Time
1:52 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9358
Sewer Name
E JOINT OUTFALL E - UNIT 1
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_911507_TV30070_SEP2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
E 0021
Downstream MH
E 0126
Dir. of Survey
Downstream
Length Surveyed
233.1 ft.
Total Length
233.1 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
135
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
135
Pipe schematic from manhole E 0021 to E 0126
MH: E 0021MH: E 0126downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 00210 ft. MWL - Water Level, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT (& BARE IN PLACES THROUGHOUT).2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start152 ft. MGO - General Observation - BROKEN REINFORCEMENT @ 3 O'CLK.228.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish233.1 ft. AMH - Downstream Manhole, Survey Ends - E 0126233.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • General Observation - MAG COATING THROUGHOUT (& BARE IN PLACES THROUGHOUT).

    2 ft. - General Observation - MAG COATING THROUGHOUT (& BARE IN PLACES THROUGHOUT).

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
233.1AMHE 0126
228.9SAP
2MGOMAG COATING THROUGHOUT (& BARE IN PLACES THROUGHOUT).
233.1MGOCONNECTION AT MH 3 O'CLOCK
152MGOBROKEN REINFORCEMENT @ 3 O'CLK.
0MWM
2SAP
0AMHE 0021
0MWL

Properties (7)

additional_info
630069090921203
custom_field_three
PROJECTING AGGREGATE-BROKN REINFORCMNT/SPOTTY MAG
custom_field_two
1
customer
1
datetime
2021-09-10T01:52:06-07:00
documentation
PRO PIPE
is_lateral_inspection
false