Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 10, 2021, 06:28 AM
  • E 0025_E 0024_09092021_234432.mp4

Date
09/09/2021
W/O
911507
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00027
PipeID
P07606
Time
11:28 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9358
Sewer Name
E JOINT OUTFALL E - UNIT 1
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_911507_TV30070_SEP2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
15 in.
Upstream MH
E 0025
Downstream MH
E 0024
Dir. of Survey
Downstream
Length Surveyed
485.3 ft.
Total Length
485.3 ft.
Structural Index
3
Structural Quick
3R00
Structural Rating
288
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
292
Pipe schematic from manhole E 0025 to E 0024
MH: E 0025MH: E 0024downstream0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 00252 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. MWM - Water Mark, 50 %of cross sectional area56 ft. MGO - General Observation - BROKEN REINFORCEMENT @ 3 O'CLK.156.7 ft. MWM - Water Mark, 40 %of cross sectional area156.7 ft. MWL - Water Level, 35 %of cross sectional area426 ft. MGO - General Observation - POSSIBLE OPEN CONNECTION @ 10 O'CLK. - (EXPECTED TO BE SEEN AFTER VIEWING A "REVERSE" 2019 CCTV INSPECTION).482.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish485.3 ft. AMH - Downstream Manhole, Survey Ends - E 0024

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

Observations (11)

DistanceCodeObservation
2SAP
156.7MWM
482.1SAP
156.7MWL
0MWL
2MGOMAG COATING THROUGHOUT
426MGOPOSSIBLE OPEN CONNECTION @ 10 O'CLK. - (EXPECTED TO BE SEEN AFTER VIEWING A "REVERSE" 2019 CCTV INSPECTION).
0AMHE 0025
56MGOBROKEN REINFORCEMENT @ 3 O'CLK.
485.3AMHE 0024
2MWM

Properties (7)

additional_info
630069090921203
custom_field_three
PROJECTING AGGREGATE - ONE BREAK IN RENFRCMNT SEEN
custom_field_two
1
customer
1
datetime
2021-09-09T23:28:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false