Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 10, 2021, 06:44 AM
  • E 0024_E 0023_09102021_001028.mp4

Date
09/09/2021
W/O
911507
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00027
PipeID
P07605
Time
11:44 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9358
Sewer Name
E JOINT OUTFALL E - UNIT 1
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_911507_TV30070_SEP2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
15 in.
Upstream MH
E 0024
Downstream MH
E 0023
Dir. of Survey
Downstream
Length Surveyed
448.2 ft.
Total Length
448.2 ft.
Structural Index
3
Structural Quick
3Q00
Structural Rating
267
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
267
Pipe schematic from manhole E 0024 to E 0023
MH: E 0024MH: E 0023downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 00240 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT445.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish448.2 ft. AMH - Downstream Manhole, Survey Ends - E 0023

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

Observations (7)

DistanceCodeObservation
2SAP
445.7SAP
0MWL
448.2AMHE 0023
0AMHE 0024
0MWM
2MGOMAG COATING THROUGHOUT

Properties (7)

additional_info
630069090921203
custom_field_three
PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-09-09T23:44:48-07:00
documentation
PRO PIPE
is_lateral_inspection
false