Wastewater/Activity/PacpInspection/1.0Sep 10, 2021, 07:11 AM
  • E 0023_E 0022_09102021_004700.mp4

Date
09/10/2021
W/O
911507
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00027
PipeID
P07604
Time
12:11 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9358
Sewer Name
E JOINT OUTFALL E - UNIT 1
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_911507_TV30070_SEP2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
15 in.
Upstream MH
E 0023
Downstream MH
E 0022
Dir. of Survey
Downstream
Length Surveyed
396.7 ft.
Total Length
396.7 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
237
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
237
Pipe schematic from manhole E 0023 to E 0022
MH: E 0023MH: E 0022downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 00232 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT395.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish396.7 ft. AMH - Downstream Manhole, Survey Ends - E 0022

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

Observations (7)

DistanceCodeObservation
2SAP
2MGOMAG COATING THROUGHOUT
0MWL
0MWM
0AMHE 0023
395.9SAP
396.7AMHE 0022

Properties (7)

additional_info
630069090921203
custom_field_three
PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-09-10T00:11:04-07:00
documentation
PRO PIPE
is_lateral_inspection
false