Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 21, 2021, 04:21 PM
  • H 1341_B 0219_09212021_092935.mp4

Date
09/21/2021
W/O
911699
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00085
PipeID
P08801
Time
9:21 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9128
Sewer Name
B JOINT OUTFALL B - UNIT 2B
City
SOUTH EL MONTE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_911699_TV15203_SEP2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Width
27 in.
Upstream MH
H 1341
Downstream MH
B 0219
Dir. of Survey
Downstream
Length Surveyed
202.6 ft.
Total Length
202.6 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole H 1341 to B 0219
MH: H 1341MH: B 0219downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 13410 ft. MWL - Water Level, 20 %of cross sectional area2 ft. MGO - General Observation - MAG COAT7.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start183.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start202.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish202.6 ft. AMH - Downstream Manhole, Survey Ends - B 0219202.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish202.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    183.6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
202.6SSS
202.6AMHB 0219
0MWM
202.6SAP
7.4SAP
2MGOMAG COAT
0AMHH 1341
7.4SSS
0MWL
183.6SRV
202.6SRV

Properties (7)

additional_info
630138092121071
custom_field_three
REINFORCEMENT VISIBLE, AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2021-09-21T09:21:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false