Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 20, 2021, 12:29 PM
  • 32 0245_32 1339_09202021_053624.mp4

Date
09/20/2021
W/O
911391
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00887
PipeID
P26306
Time
5:29 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9371
Sewer Name
32 DISTRICT #32 MAIN TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_911391_TV32048_SEP2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
32 0245
Downstream MH
32 1339
Dir. of Survey
Downstream
Length Surveyed
19.6 ft.
Total Length
19.6 ft.
Structural Index
3
Structural Quick
5132
Structural Rating
15
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
19
Pipe schematic from manhole 32 0245 to 32 1339
MH: 32 0245MH: 32 1339downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 02450 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start11.6 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES14.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish14.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish14.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish19.6 ft. MGO - General Observation - STOP LOG CONNECTION AT 12 O'CLOCK19.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK19.6 ft. AMH - Downstream Manhole, Survey Ends - 32 1339

Observation photos (5)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

    11.6 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

  • General Observation - STOP LOG CONNECTION AT 12 O'CLOCK

    19.6 ft. - General Observation - STOP LOG CONNECTION AT 12 O'CLOCK

Observations (14)

DistanceCodeObservation
2SSS
0MWM
11.6SRV
0MWL
2SAP
2DAGS
19.6MGOSTOP LOG CONNECTION AT 12 O'CLOCK
0AMH32 0245
14.2SSS
19.6MGOCONNECTION AT MH 3 O'CLOCK
14.2SAP
0MGOCONNECTION AT MH 3 O'CLOCK
14.2DAGS
19.6AMH32 1339

Properties (7)

additional_info
630069092021002
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-09-20T05:29:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false