Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 31, 2021, 07:50 AM
  • 02 1934_02 1933_08312021_010054.mp4

Date
08/31/2021
W/O
911863
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00238
PipeID
P04707
Time
12:50 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9340
Sewer Name
02 BELVEDERE TRUNK
City
EAST LOS ANGELES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
05
Purpose
Routine Assessment
Project
WO_911863_TV02024_SEP2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
24 in.
Upstream MH
02 1934
Downstream MH
02 1933
Dir. of Survey
Downstream
Length Surveyed
281 ft.
Total Length
281 ft.
Structural Index
3
Structural Quick
3K2J
Structural Rating
286
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
2
Overall Quick
Overall Rating
396
Pipe schematic from manhole 02 1934 to 02 1933
MH: 02 1934MH: 02 1933downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 19342 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start84.2 ft. CM - Crack Multiple, from 09 to 01 o'clock, within 8 inches of joint: YES194.9 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES214.9 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES255.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES278 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish278 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish278 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish281 ft. AMH - Downstream Manhole, Survey Ends - 02 1933

Observation photos (4)

  • Crack Multiple, from 09 to 01 o'clock, within 8 inches of joint: YES

    84.2 ft. - Crack Multiple, from 09 to 01 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES

    194.9 ft. - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    214.9 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    255.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
278SSS
281AMH02 1933
0MWM
194.9CL
278CM
0MWL
2CM
0AMH02 1934
2SSS
255.2CM
278DAGS
2DAGS
214.9CM
84.2CM

Properties (7)

additional_info
630074083021201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2021-08-31T00:50:15-07:00
documentation
PROPIPE
is_lateral_inspection
false