Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 31, 2021, 05:11 AM
  • 02 1335_02 1334_08302021_222055.mp4

Date
08/30/2021
W/O
911863
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00238
PipeID
P03859
Time
10:11 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9340
Sewer Name
02 BELVEDERE TRUNK
City
EAST LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
08
Purpose
Routine Assessment
Project
WO_911863_TV02024_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
02 1335
Downstream MH
02 1334
Dir. of Survey
Downstream
Length Surveyed
318.5 ft.
Total Length
318.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
315
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
441
Pipe schematic from manhole 02 1335 to 02 1334
MH: 02 1335MH: 02 1334downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 13350 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start23 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"97.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"154.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"229.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"304.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN316 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish316 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish318.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1334318.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish318.5 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
23TFA
2SSS
318.5AMH02 1334
316DAGS
2.3SAV
97.4TFA
0MGOROACHES @ MH
154.5TFA
316SSS
0MWM
0AMH02 1335
318.5SAV
0MWL
304.9TFOPEN
2DAGS
229.4TFA
318.5MGOCONN @ MH 9 O'CLOCK/ACTIVE

Properties (7)

additional_info
630074083021201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-08-30T22:11:38-07:00
documentation
PROPIPE
is_lateral_inspection
false