Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 3, 2021, 08:49 AM
  • B 0691_B 0690_09032021_020659.mp4

Date
09/03/2021
W/O
911654
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00110
PipeID
P09361
Time
1:49 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9119
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
IRWINDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
WO_911654_TV15057_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
36 in.
Upstream MH
B 0691
Downstream MH
B 0690
Dir. of Survey
Downstream
Length Surveyed
397.9 ft.
Total Length
397.9 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
395
O&M Index
2
O&M Quick
4125
O&M Rating
14
Overall Index
2
Overall Quick
Overall Rating
409
Pipe schematic from manhole B 0691 to B 0690
MH: B 0691MH: B 0690downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 06910 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start68.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"111.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"141 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start167.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"167.1 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish170.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"176.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"179.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"277.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"284 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"291.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"295.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"388 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"391.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"395 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish395.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish397.9 ft. AMH - Downstream Manhole, Survey Ends - B 0690

Observation photos (3)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Compacted,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    141 ft. - Deposits Settled Compacted, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
395.1SAV
295.6TF
277.2TF
2MGOMAG COATING THROUGHOUT
68.9TF
111.7TF
0MWM
0AMHB 0691
167.1TF
141DSC
0MGOCONNECTION AT MH 6 O'CLOCK
167.1DSC
2SAV
397.9AMHB 0690
2SSS
395SSS
0MWL
170.6TF
284TF
291.1TF
388TF
179.1TF
391.6TF
176.4TF

Properties (7)

additional_info
630069090221201
custom_field_three
AGGREGATE VISIBLE, MAG COAT
custom_field_two
3
customer
1
datetime
2021-09-03T01:49:18-07:00
documentation
PRO PIPE
is_lateral_inspection
false