Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 2, 2021, 08:42 AM
  • B 0716A_B 0716_09022021_015343.mp4

Date
09/02/2021
W/O
911654
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00110
PipeID
P09391
Time
1:42 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9118
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
WO_911654_TV15057_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
39 in.
Upstream MH
B 0716A
Downstream MH
B 0716
Dir. of Survey
Downstream
Length Surveyed
187.1 ft.
Total Length
187.1 ft.
Structural Index
3
Structural Quick
3E00
Structural Rating
96
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
96
Pipe schematic from manhole B 0716A to B 0716
MH: B 0716AMH: B 0716downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 0716A0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT12.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"15.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"26.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start61 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"64.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"113.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"116.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"161.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"165 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"187.1 ft. AMH - Downstream Manhole, Survey Ends - B 0716187.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK187.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    26.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
2MGOMAG COATING THROUGHOUT
15.6TFC
12.2TFC
0MGOCONNECTION AT MH 9 O'CLOCK
161.5TFC
26.2SAV
113.3TFA
64.2TFC
116.7TFC
0MWM
187.1AMHB 0716
187.1MGOCONNECTION AT MH 9 O'CLOCK
165TFC
61TFC
0AMHB 0716A
0MWL
187.1SAV

Properties (7)

additional_info
630069090121201
custom_field_three
AGGREGATE VISIBLE, MAG COAT
custom_field_two
3
customer
1
datetime
2021-09-02T01:42:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false