Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 2, 2021, 05:35 AM
  • B 0712_B 0711_09012021_224916.mp4

Date
09/01/2021
W/O
911654
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00110
PipeID
P09385
Time
10:35 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9118
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
WO_911654_TV15057_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
39 in.
Upstream MH
B 0712
Downstream MH
B 0711
Dir. of Survey
Downstream
Length Surveyed
272.8 ft.
Total Length
272.8 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
162
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
162
Pipe schematic from manhole B 0712 to B 0711
MH: B 0712MH: B 0711downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 07123.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.2 ft. MGO - General Observation - MAG COATING THROUGHOUT45.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"66.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"111.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"202.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"247 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"266.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"272.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish272.8 ft. AMH - Downstream Manhole, Survey Ends - B 0711272.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    3.2 ft. - General Observation - MAG COATING THROUGHOUT

Observations (15)

DistanceCodeObservation
3.2SAV
3.2MGOMAG COATING THROUGHOUT
0MWL
272.8SAV
111.4TF
0MGOCONNECTION AT MH 3 O'CLOCK
272.8AMHB 0711
266.4TF
272.8MGOCONNECTION AT MH 3 O'CLOCK
247TF
202.3TF
45.8TF
0MWM
0AMHB 0712
66.8TF

Properties (7)

additional_info
630069090121201
custom_field_three
AGGREGATE VISIBLE, MAG COAT
custom_field_two
3
customer
1
datetime
2021-09-01T22:35:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false