Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 3, 2021, 05:12 AM
  • B 0706_B 0705_09022021_222902.mp4

Date
09/02/2021
W/O
911654
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00110
PipeID
P09379
Time
10:12 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9119
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
IRWINDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
WO_911654_TV15057_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
54 in.
Upstream MH
B 0706
Downstream MH
B 0705
Dir. of Survey
Downstream
Length Surveyed
295.4 ft.
Total Length
295.4 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
174
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
174
Pipe schematic from manhole B 0706 to B 0705
MH: B 0706MH: B 0705downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 07060 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT2.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"46.8 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"54.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"60.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"94.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"197.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"207.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"265.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"293.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish295.4 ft. AMH - Downstream Manhole, Survey Ends - B 0705295.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"

    46.8 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"

Observations (16)

DistanceCodeObservation
60.7TF
295.4AMHB 0705
46.8TB
2.8SAV
295.4MGOCONNECTION AT MH 3 O'CLOCK
207.2TF
54.5TFC
2MGOMAG COATING THROUGHOUT
197.9TFC
94.1TFA
265.1TFC
0AMHB 0706
0MWM
0MWL
30.1TFA
293.7SAV

Properties (7)

additional_info
630069090221201
custom_field_three
AGGREGATE VISIBLE, MAG COAT
custom_field_two
3
customer
1
datetime
2021-09-02T22:12:07-07:00
documentation
PRO PIPE
is_lateral_inspection
false