Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 3, 2021, 05:52 AM
  • B 0705_B 0704_09022021_230905.mp4

Date
09/02/2021
W/O
911654
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00110
PipeID
P09378
Time
10:52 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9119
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
IRWINDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
WO_911654_TV15057_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
54 in.
Upstream MH
B 0705
Downstream MH
B 0704
Dir. of Survey
Downstream
Length Surveyed
310.1 ft.
Total Length
310.1 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
183
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
183
Pipe schematic from manhole B 0705 to B 0704
MH: B 0705MH: B 0704downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 07050 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start39.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"54.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"142.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"161.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"179.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"206.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"217 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"219.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"250.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"308 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish310.1 ft. AMH - Downstream Manhole, Survey Ends - B 0704

Observation photos (3)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"

    217 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"

Observations (17)

DistanceCodeObservation
310.1AMHB 0704
217TB
206.6TF
0AMHB 0705
250.9TF
179.6TFC
2MGOMAG COATING THROUGHOUT
142.6TF
219.9TF
39.1TF
0MGOCONNECTION AT MH 6 O'CLOCK
308SAV
161.1TF
0MWM
54.1TF
0MWL
2SAV

Properties (7)

additional_info
630069090221201
custom_field_three
AGGREGATE VISIBLE, MAG COAT
custom_field_two
3
customer
1
datetime
2021-09-02T22:52:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false