Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 1, 2021, 05:24 AM
  • 14 1101_14 1100_08312021_223758.mp4

Date
08/31/2021
W/O
911390
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01179
PipeID
P26053
Time
10:24 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9344
Sewer Name
14 WEST SIDE RELIEF TRUNK
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
10
Purpose
Routine Assessment
Project
WO_911390_TV14056_SEP2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
14 1101
Downstream MH
14 1100
Dir. of Survey
Downstream
Length Surveyed
407.7 ft.
Total Length
407.7 ft.
Structural Index
2
Structural Quick
2O00
Structural Rating
162
O&M Index
2
O&M Quick
2Q00
O&M Rating
184
Overall Index
2
Overall Quick
Overall Rating
346
Pipe schematic from manhole 14 1101 to 14 1100
MH: 14 1101MH: 14 1100downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 11010 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start17.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN25.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN46.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN68.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN119.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"155.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN211.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"214.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"242.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN260.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN308.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN345.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN345.7 ft. MWL - Water Level, 40 %of cross sectional area359.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"359.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS405 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish405.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish405.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish405.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish407.7 ft. AMH - Downstream Manhole, Survey Ends - 14 1100407.7 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, 40 %of cross sectional area

    345.7 ft. - Water Level, 40 %of cross sectional area

Observations (27)

DistanceCodeObservation
407.7AMH14 1100
0AMH14 1101
2DAGS
2SSS
46.2TFOPEN
405.9DAGS
345.7TFOPEN
119.2TFA
308.9TFOPEN
405.9DAE
214.2TFA
0MWM
2DAE
211.8TFA
0MWL
155.2TFOPEN
17.1TFOPEN
359.6TFA
242.7TFOPEN
260.5TFOPEN
68.9TFOPEN
345.7MWL
359.6DSZDEBRIS
25.3TFOPEN
407.7MGOCONN @ MH 9 O'CLOCK/ACTIVE
405SSS
405.9DSZ

Properties (8)

additional_info
630069083121201
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-08-31T22:24:12-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
40175