Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2021, 05:44 AM
  • 32 1172_32 1171_08112021_230730.mp4

Date
08/11/2021
W/O
906609
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19626
Time
10:44 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9230
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_906609_TV32021_AUG2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1172
Downstream MH
32 1171
Dir. of Survey
Downstream
Length Surveyed
565.8 ft.
Total Length
565.8 ft.
Structural Index
3
Structural Quick
3V2V
Structural Rating
565
O&M Index
3
O&M Quick
3B00
O&M Rating
48
Overall Index
3
Overall Quick
Overall Rating
613
Pipe schematic from manhole 32 1172 to 32 1171
MH: 32 1172MH: 32 1171downstream0 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 11720 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"46.3 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS92.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"96.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"123.7 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish170.7 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"219.2 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"222.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"248.3 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"263.6 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"324.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"332.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"388.7 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"430 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"433.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"447 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"490.8 ft. OBM - Obstacles Pipe Material, 15 %of cross sectional area, from 04 to 08 o'clock530.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"535.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"565 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish565 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish565.8 ft. AMH - Downstream Manhole, Survey Ends - 32 1171

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    46.3 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

  • Obstacles Pipe Material, 15 %of cross sectional area, from 04 to 08 o'clock

    490.8 ft. - Obstacles Pipe Material, 15 %of cross sectional area, from 04 to 08 o'clock

Observations (28)

DistanceCodeObservation
222.7TFA
92.5TFA
430TFA
0MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
96.9TFC
123.7DSZ
332.3TFA
263.6TBA
2SSS
565.8AMH32 1171
535.1TFC
388.7TBA
170.7TBA
2SAP
248.3TB
447TBA
0MWM
490.8OBM
219.2TFA
530.9TFA
0AMH32 1172
0MWL
433.4TFA
46.3DSZDEBRIS
32TFA
565SAP
324.2TF
565SSS

Properties (7)

additional_info
630069081121201
custom_field_three
PROJECTING AGGREGATE, SPALLING
custom_field_two
2
customer
1
datetime
2021-08-11T22:44:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false