Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2021, 06:12 AM
  • 32 1167_32 1166_08122021_232007.mp4

Date
08/12/2021
W/O
906609
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19621
Time
11:12 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9234
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_906609_TV32021_AUG2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1167
Downstream MH
32 1166
Dir. of Survey
Downstream
Length Surveyed
115.2 ft.
Total Length
115.2 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
110
O&M Index
2
O&M Quick
2C00
O&M Rating
44
Overall Index
2
Overall Quick
Overall Rating
154
Pipe schematic from manhole 32 1167 to 32 1166
MH: 32 1167MH: 32 1166downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 11670 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start102.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"113 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish113 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish113 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish115.2 ft. AMH - Downstream Manhole, Survey Ends - 32 1166

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0AMH32 1167
2SSS
113DAGS
115.2AMH32 1166
102.5TFC
0MWM
2DAGS
0MWL
2SAP
113SAP
113SSS

Properties (7)

additional_info
630069081221202
custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
2
customer
1
datetime
2021-08-12T23:12:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false