Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2021, 07:18 AM
  • 32 1164_32 1163_08132021_003108.mp4

Date
08/13/2021
W/O
906609
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19618
Time
12:18 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9234
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_906609_TV32021_AUG2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1164
Downstream MH
32 1163
Dir. of Survey
Downstream
Length Surveyed
448.8 ft.
Total Length
448.8 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
445
O&M Index
2
O&M Quick
2Q11
O&M Rating
179
Overall Index
2
Overall Quick
Overall Rating
624
Pipe schematic from manhole 32 1164 to 32 1163
MH: 32 1164MH: 32 1163downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 11642 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start186.6 ft. RFJ - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YESR188.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"432.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"446 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish446 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish446 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish448.8 ft. AMH - Downstream Manhole, Survey Ends - 32 1163

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YESR

    186.6 ft. - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YESR

Observations (13)

DistanceCodeObservation
0MWM
0MWL
432.4TFC
0AMH32 1164
446DAGS
2SSS
446SSS
188.9TFC
186.6RFJ
2SAP
2DAGS
448.8AMH32 1163
446SAP

Properties (7)

additional_info
630069081221202
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-08-13T00:18:54-07:00
documentation
PRO PIPE
is_lateral_inspection
false