- Date
- 08/13/2021
- W/O
- 906609
- Weather
- Dry
- Operator/Surveyor
- S. LOPEZ
- Sewer ID
- Z00839
- PipeID
- P19616
- Time
- 12:38 AM
- Certificate
- U-0720-70309212
- System Owner
- 1
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K9234
- Sewer Name
- 32 SAN FERNANDO ROAD TRUNK
- City
- SANTA CLARITA
- Loc. details
- Easement/Right of Way
- Location Code
- D
- Use of Sewer
- Sanitary Sewer
- District
- District 32
- Page No.
- 09
- Purpose
- Routine Assessment
- Project
- RFIR_WO_906609_TV32021_AUG2021
- Sewer Type
- Gravity
- Material
- NRCP
- Shape
- Circular
- Height
- 18 in.
- Width
- 18 in.
- Upstream MH
- 32 1162
- Downstream MH
- 32 1161
- Dir. of Survey
- Downstream
- Length Surveyed
- 247 ft.
- Total Length
- 247 ft.
- Structural Index
- 3
- Structural Quick
- 3E2E
- Structural Rating
- 160
- O&M Index
- 2
- O&M Quick
- 2L00
- O&M Rating
- 132
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 292
Pipe schematic from manhole 32 1162 to 32 1161 Observation photos (6)

2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

59.8 ft. - Material Change, Vitrified clay pipe

144.8 ft. - Material Change, Concrete pipe (non-reinfored)

144.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start