Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 13, 2021, 10:00 AM
  • 22 0876_22 0875_09132021_031321.mp4

Date
09/13/2021
W/O
911293
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00798
PipeID
P17245
Time
3:00 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9359
Sewer Name
22 CONEY TRUNK, SECTION 1
City
AZUSA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
11
Purpose
Routine Assessment
Project
WO_911293_TV22132_SEP2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0876
Downstream MH
22 0875
Dir. of Survey
Downstream
Length Surveyed
342.6 ft.
Total Length
342.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 22 0876 to 22 0875
MH: 22 0876MH: 22 0875downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - ROOTS AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 22 08762 ft. RMJ - Roots Medium Joint, from 12 to 06 o'clock, 15 %, within 8 inches of joint: YESR32.5 ft. MWM - Water Mark, 10 %of cross sectional area85.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"101.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"158.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"181.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"279.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"312.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"341 ft. MGO - General Observation - Magnesium Hydroxide Coating throughout342.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0875

Observation photos (2)

  • General Observation - ROOTS AT MH

    0 ft. - General Observation - ROOTS AT MH

  • Roots Medium Joint, from 12 to 06 o'clock, 15 %, within 8 inches of joint: YESR

    2 ft. - Roots Medium Joint, from 12 to 06 o'clock, 15 %, within 8 inches of joint: YESR

Observations (14)

DistanceCodeObservation
341MGOMagnesium Hydroxide Coating throughout
312.2TFC
0MWL
0MGOROOTS AT MH
158.3TFC
238.7TFC
32.5MWM
181.8TFC
279.2TFC
0AMH22 0876
342.6AMH22 0875
101.5TFC
2RMJ
85.2TFC

Properties (6)

additional_info
630069091321001
custom_field_two
4
customer
1
datetime
2021-09-13T03:00:36-07:00
documentation
PRO PIPE
is_lateral_inspection
false