Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 31, 2021, 10:49 AM
  • 02 1331_02 1330_08312021_040108.mp4

Date
08/31/2021
W/O
911862
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00238
PipeID
P03855
Time
3:49 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9342
Sewer Name
02 BELVEDERE TRUNK
City
EAST LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
08
Purpose
Routine Assessment
Project
WO_911862_TV02364_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
27 in.
Upstream MH
02 1331
Downstream MH
02 1330
Dir. of Survey
Downstream
Length Surveyed
250.3 ft.
Total Length
250.3 ft.
Structural Index
3
Structural Quick
3S2I
Structural Rating
395
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
395
Pipe schematic from manhole 02 1331 to 02 1330
MH: 02 1331MH: 02 1330downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 13310 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE87.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"104.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN116.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN175.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN248 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish248 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish250.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish250.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1330250.3 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE250.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (1)

  • General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

    2.2 ft. - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observations (19)

DistanceCodeObservation
2CM
87.1TFC
177.9TFOPEN
175.9TFC
0MGOROACHES @ MH
250.3SAV
248CM
104.8TFOPEN
2SSS
248SSS
0MWL
250.3AMH02 1330
250.3MGOCONN @ MH 9 O'CLOCK/ACTIVE
0AMH02 1331
2.1SAV
0MWM
250.3MGOCONN @ MH 3 O'CLOCK/ACTIVE
2.2MGOCONN @ MH 3 O'CLOCK/ACTIVE
116.2TFOPEN

Properties (7)

additional_info
630074083021203
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-08-31T03:49:38-07:00
documentation
PROPIPE
is_lateral_inspection
false