Date
06/30/2021
W/O
896577
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00751
PipeID
P23484
Time
12:09 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9016
Sewer Name
20 20TH STREET EAST RELIEF TRUNK
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_896577_TV20025_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0286
Downstream MH
20 0285A
Dir. of Survey
Downstream
Length Surveyed
178.5 ft.
Total Length
178.5 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
105
O&M Index
2
O&M Quick
2F00
O&M Rating
70
Overall Index
3
Overall Quick
Overall Rating
175
Pipe schematic from manhole 20 0286 to 20 0285A
MH: 20 0286MH: 20 0285Adownstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 02860 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start24.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"47.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"71.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"96.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"120.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"173.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"175.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish175.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish178.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK178.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE178.5 ft. AMH - Downstream Manhole, Survey Ends - 20 0285A

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    178.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
178.4MGOCONNECTION AT MH 3 O'CLOCK
173.4TFC
24.9TFC
175.9SAP
2SAP
178.5MGOCOCKROACHES IN MANHOLE
2DAGS
175.9DAGS
96.2TFC
0MWL
178.5AMH20 0285A
0AMH20 0286
71.9TFC
47.4TFA
120.8TFC
0MWM

Properties (7)

additional_info
630069062921202
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-06-30T00:09:51-07:00
documentation
PRO PIPE
is_lateral_inspection
false