Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 30, 2021, 07:26 AM
  • 20 0285_20 0284A_06302021_003227.mp4

Date
06/30/2021
W/O
896577
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00751
PipeID
P22289
Time
12:26 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9016
Sewer Name
20 20TH STREET EAST RELIEF TRUNK
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_896577_TV20025_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0285
Downstream MH
20 0284A
Dir. of Survey
Downstream
Length Surveyed
71.1 ft.
Total Length
71.1 ft.
Structural Index
3
Structural Quick
3B00
Structural Rating
39
O&M Index
2
O&M Quick
2B00
O&M Rating
26
Overall Index
3
Overall Quick
Overall Rating
65
Pipe schematic from manhole 20 0285 to 20 0284A
MH: 20 0285MH: 20 0284Adownstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 02850 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"35.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"60.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"68.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish68.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish71.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK71.1 ft. AMH - Downstream Manhole, Survey Ends - 20 0284A71.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    71.1 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
2DAGS
2SAP
0MWL
60.2TFC
0AMH20 0285
11.8TFC
35.1TFC
71.1MGOCONNECTION AT MH 3 O'CLOCK
71.1AMH20 0284A
68.8SAP
71.1MGOCOCKROACHES IN MANHOLE
0MWM
68.8DAGS

Properties (7)

additional_info
630069062921202
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-06-30T00:26:59-07:00
documentation
PRO PIPE
is_lateral_inspection
false