Wastewater/Activity/PacpInspection/1.0Jul 1, 2021, 09:34 AM
  • 20 0295_20 0294_07012021_024057.mp4

Date
07/01/2021
W/O
896577
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00751
PipeID
P19261
Time
2:34 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9017
Sewer Name
20 20TH STREET EAST RELIEF TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_896577_TV20025_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0295
Downstream MH
20 0294
Dir. of Survey
Downstream
Length Surveyed
140.6 ft.
Total Length
140.6 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
81
O&M Index
2
O&M Quick
2D00
O&M Rating
54
Overall Index
3
Overall Quick
Overall Rating
135
Pipe schematic from manhole 20 0295 to 20 0294
MH: 20 0295MH: 20 0294downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 02950 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start111.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"127.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"138.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish138.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish140.6 ft. AMH - Downstream Manhole, Survey Ends - 20 0294

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWL
0MWM
0AMH20 0295
0MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
138.4SAP
2SAP
140.6AMH20 0294
127.5TFC
138.4DAGS
2DAGS
111.6TFC

Properties (7)

additional_info
630069063021201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-07-01T02:34:56-07:00
documentation
PRO PIPE
is_lateral_inspection
false