Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2021, 10:36 AM
  • 32 0161_32 0160_08162021_035819.mp4

Date
08/16/2021
W/O
906781
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00887
PipeID
P19913
Time
3:36 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9236
Sewer Name
32 DISTRICT #32 MAIN TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
13
Purpose
Routine Assessment
Project
WO_906781_TV32015_AUG2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 0161
Downstream MH
32 0160
Dir. of Survey
Downstream
Length Surveyed
450.5 ft.
Total Length
450.5 ft.
Structural Index
3
Structural Quick
3Q00
Structural Rating
267
O&M Index
2
O&M Quick
2Q00
O&M Rating
178
Overall Index
3
Overall Quick
Overall Rating
445
Pipe schematic from manhole 32 0161 to 32 0160
MH: 32 0161MH: 32 0160downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 32 01610 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start78.8 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"211 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"235.1 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"447.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish447.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish450.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE450.5 ft. AMH - Downstream Manhole, Survey Ends - 32 0160

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    450.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (14)

DistanceCodeObservation
0MGOCOCKROACHES IN MANHOLE
235.1TFA
211TFA
2MGOMAG COATING THROUGHOUT
450.5MGOCOCKROACHES IN MANHOLE
78.8TFA
0AMH32 0161
2SAP
450.5AMH32 0160
0MWL
0MWM
447.7DAGS
447.7SAP
2DAGS

Properties (7)

additional_info
630069081621021
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-08-16T03:36:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false