Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 14, 2021, 09:58 AM
  • 20 0652_20 0651_07142021_030306.mp4

Date
07/14/2021
W/O
901265
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01139
PipeID
P25431
Time
2:58 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9030
Sewer Name
20 35TH STREET EAST RELIEF TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
03
Purpose
Routine Assessment
Project
WO_901265_TV20048_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
20 0652
Downstream MH
20 0651
Dir. of Survey
Downstream
Length Surveyed
46.8 ft.
Total Length
46.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2800
O&M Rating
16
Overall Index
2
Overall Quick
Overall Rating
16
Pipe schematic from manhole 20 0652 to 20 0651
MH: 20 0652MH: 20 0651downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 06520 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start43.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish46.8 ft. AMH - Downstream Manhole, Survey Ends - 20 0651

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
43.5DAGS
0AMH20 0652
0MWL
0MWM
2DAGS
46.8AMH20 0651
0MGOCONNECTION AT MH 6 O'CLOCK

Properties (8)

additional_info
630069071321201
custom_field_three
LIGHT GREASE
custom_field_two
4
customer
1
datetime
2021-07-14T02:58:54-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
38858