22 1125A_22 1125_09102021_040812.mp4
3.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
34.6 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
51.4 ft. - Crack Spiral, from 09 to 10 o'clock, within 8 inches of joint: YES
80.1 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start
130.2 ft. - Fracture Multiple, from 10 to 06 o'clock, within 8 inches of joint: YES
157.5 ft. - Repair Pipe Replaced, within 8 inches of joint: YES, Start - PVC
168.1 ft. - Repair Pipe Replaced, within 8 inches of joint: YES, Finish - PVC
168.1 ft. - Joint Angular Medium
169.4 ft. - Broken Soil Visible, from 09 to 03 o'clock, within 8 inches of joint: YES
169.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start
169.4 ft. - Water Level, Sag in pipe, 50 %of cross sectional area, Start
| Distance | Code | Observation |
|---|---|---|
| 180.4 | MCU | — |
| 183.6 | DAGS | — |
| 0 | MWL | — |
| 157.5 | RPR | PVC |
| 26.9 | RFJ | — |
| 168.1 | RPR | PVC |
| 3.4 | DAGS | — |
| 80.1 | MWLS | — |
| 169.4 | BSV | — |
| 101.5 | MWLS | — |
| 0 | MWM | — |
| 38.7 | FM | — |
| 35 | B | — |
| 130.2 | FM | — |
| 34.6 | FM | — |
| 168.1 | JAM | — |
| 36 | FL | — |
| 36 | JOM | — |
| 183.6 | MSA | VIEW OBSTRUCTED AFTER CAMERA WAS SUBMERGED |
| 148.6 | DAGS | — |
| 0 | AMH | 22 1125 |
| 178 | MGO | VIEW OBSRUCTED BY WATER LEVEL |
| 183.6 | MCU | — |
| 51.4 | CS | — |
| 169.4 | DAGS | — |
| 183.6 | MWLS | — |
| 169.4 | MWLS | — |