Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2021, 08:41 AM
  • H 0988_H 0987_08132021_015719.mp4

Date
08/13/2021
W/O
906779
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01005
PipeID
P15401
Time
1:41 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9117
Sewer Name
H JOINT OUTFALL H - UNIT 7C
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_906779_TV21087_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0988
Downstream MH
H 0987
Dir. of Survey
Downstream
Length Surveyed
428.9 ft.
Total Length
428.9 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
425
O&M Index
2
O&M Quick
2P00
O&M Rating
170
Overall Index
2
Overall Quick
Overall Rating
595
Pipe schematic from manhole H 0988 to H 0987
MH: H 0988MH: H 0987downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 09880 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start226 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN403.9 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN426 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish426 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish426.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish428 ft. MGO - General Observation - ROACHES @ MH428.6 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN428.9 ft. AMH - Downstream Manhole, Survey Ends - H 0987428.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 65% MAG COAT

    2 ft. - General Observation - 65% MAG COAT

  • Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN

    226 ft. - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    403.9 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (16)

DistanceCodeObservation
428.9AMHH 0987
426SAV
0MWM
2SSS
428.6MGOCONN @ MH 3 O'CLOCK/OPEN
0AMHH 0988
426.4SSS
2SAV
2MGO65% MAG COAT
403.9TBOPEN
226TFOPEN
428MGOROACHES @ MH
426DAGS
428.9MGOCONN @ MH 9 O'CLOCK/OPEN
2DAGS
0MWL

Properties (7)

additional_info
630138081221201
custom_field_three
MAG COAT, SPALLING
custom_field_two
3
customer
1
datetime
2021-08-13T01:41:32-07:00
documentation
PRO PIPE
is_lateral_inspection
false