Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2021, 08:58 AM
  • H 0987_H 0986_08132021_021543.mp4

Date
08/13/2021
W/O
906779
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01005
PipeID
P15400
Time
1:58 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9117
Sewer Name
H JOINT OUTFALL H - UNIT 7C
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_906779_TV21087_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0987
Downstream MH
H 0986
Dir. of Survey
Downstream
Length Surveyed
507.8 ft.
Total Length
507.8 ft.
Structural Index
3
Structural Quick
3S2S
Structural Rating
503
O&M Index
2
O&M Quick
2S00
O&M Rating
202
Overall Index
2
Overall Quick
Overall Rating
705
Pipe schematic from manhole H 0987 to H 0986
MH: H 0987MH: H 0986downstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN0 ft. AMH - Upstream Manhole, Survey Begins - H 09870 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 75% MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start504.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish505 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish505 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish507 ft. MGO - General Observation - ROACHES @ MH507.8 ft. AMH - Downstream Manhole, Survey Ends - H 0986

Observation photos (2)

  • General Observation - 75% MAG COAT

    2 ft. - General Observation - 75% MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
504.4SSS
507.8AMHH 0986
0MGOCONN @ MH 3 O'CLOCK/OPEN
0MWL
505SAV
2DAGS
505DAGS
0MGOCONN @ MH 9 O'CLOCK/OPEN
507MGOROACHES @ MH
2MGO75% MAG COAT
2SSS
2SAV
0AMHH 0987
0MWM

Properties (7)

additional_info
630138081221201
custom_field_three
MAG COAT, SPALLING
custom_field_two
3
customer
1
datetime
2021-08-13T01:58:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false